    Two phase project updating existing substation. Phasing was needed to allow continuous operation of the substation in order to supply continuous power to the Capital Building.
Location: Harrisburg, PA
Scope:
                      
						- site preparation / utility restoration and installation
						- 2 phase substation demolition